Disclosures

Participant Rolling Outage Plan

The Electricity Authority has a System Operator Rolling Outage Plan. This requires participants to prepare Participant Rolling Outage Plans. The purpose of such plans is to specify the actions that would be undertaken to reduce the consumption of electricity when a supply shortage is declared by the System Operator.

Events that could lead the Electricity Authority to declare a supply shortage can be generally categorised as immediate events that occur with little or no warning, or developing events that evolve over time.

Wellington Electricity's Participant Rolling Outage Plan details the planned actions for both categories of events.

Reducing consumption by disconnecting consumers would be the last resort, after all other forms of reduction had been employed. While this is Wellington Electricity’s planned response, a change in circumstances or network conditions may require the plan to be adjusted to suit operating conditions at the time.

Related Documents

Participant Rolling Outage Plan
519 KB  |  pdf  |  Download

How helpful was this page?

You have not rated this page yet

Thanks, your feedback has been successfully submitted

To help improve our service, what feedback can you give us about this page?

No thanks, I'll skip

In an emergency please contact our 24 hour Electricity Emergency Line

0800 248 148

For all other matters, please view our contact details here or call your electricity retailer